Question

H. Propose a synthesis method to show how you will prepare or make an aldehyde starting from an ester.

140

likes
699 views

Answer to a math question H. Propose a synthesis method to show how you will prepare or make an aldehyde starting from an ester.

Expert avatar
Timmothy
4.8
99 Answers
To prepare an aldehyde from an ester, we can use the following steps:

1. Hydrolysis of the ester:
The ester will be hydrolyzed under acidic or basic conditions to form a carboxylic acid and an alcohol. The acid will further be reduced to an aldehyde by LiAlH4 or NaBH4.

2. Reduction of carboxylic acid to aldehyde:
The carboxylic acid formed from the hydrolysis of the ester can be reduced to the aldehyde using a reducing agent such as LiAlH4 or NaBH4.

Therefore, the synthesis method involves the hydrolysis of the ester followed by reduction of the resulting carboxylic acid to obtain the aldehyde.

\textbf{Answer:}
The aldehyde can be prepared starting from an ester by first hydrolyzing the ester to obtain a carboxylic acid and an alcohol, followed by the reduction of the carboxylic acid to the aldehyde.

Frequently asked questions (FAQs)
What is the sum of the interior angles of an equilateral triangle?
+
What is the vertex form equation of a quadratic function if the vertex is (-2, 5)?
+
What are the measures of the acute angles in a right triangle if one leg is 12 units long and the hypotenuse is 13 units long?
+
New questions in Mathematics
The time it takes for a person to travel 300 m is 15 minutes. What is their speed in meters per second?
The gross domestic product the gdp for the United States in 2017 was approximately $2.05x10^3. If you wrote this number in standard notation , it would be 205 followed by how many zeros
The actual length of an object is 1.3 m . If the blueprint uses a scale of 1 : 12 , what is the length of the line on the drawing?
(-5/6)-(-5/4)
Solve this mathematical problem if 3/5 of a roll of tape measures 2m. How long is the complete roll?
2x2 and how much?
A construction company is working on two projects: house construction and building construction. Each house requires 4 weeks of work and produces a profit of $50,000. Each building requires 8 weeks of work and produces a profit of $100,000. The company has a total of 24 work weeks available. Furthermore, it is known that at least 2 houses and at least 1 building must be built to meet the demand. The company wants to maximize its profits and needs to determine how many houses and buildings it should build to meet demand and maximize profits, given time and demand constraints.
In a order to compare the means of two populations, independent random samples of 410 observations are selected from each population, with Sample 1 the results found in the table to the right. Complete parts a through e below. X1 = 5,319 S1= 143 a. Use a 95% confidence interval to estimate the difference between the population means (H - H2) Interpret the contidence interval. The contidence interval IS (Round to one decimal place as needed.) Sample 2 X2 = 5,285 S2 = 198 Aa. Use a 95% confidence interval to estimate the difference between the population means (A1 - M2) Interpret the contidence interval. The contidence interval Is (Round to one decimal place as needed.) b. Test the null hypothesis Ho versus alternative hypothesis Ha (H What is the test statistic? H2) + Give the significance level of the test, and interpret the result. Use a = 0.05. Z=
28 is 92 percent of what?
In measuring the internal radius of a circular sewer the measurement is 2% too large. If this measurement is then used to calculate the circular cross-sectional area of the pipe: Determine, by using the binomial theory, the percentage error that will occur compared to the true area.
A building lot is in the shape of a triangle with a base of 133 feet and a height of 76 feet. What is it's area in square feet?
The mass of 120 molecules of X2C4 is 9127.2 amu. Identify the unknown atom, X, by finding the atomic mass. The atomic mass of C is 12.01 amu/atom
The annual real property tax liability for a residential property is $4302 and has been paid by the seller in advance of closing. Using the 30-day month/260-day year method what will be the tax proration entry on the settlement statement round to the nearest dollar for a closing on Oct. 26 if the buyer owns the day of closing? a. $3525 credit to the buyer and $777 debit to the seller b. $777 debit to the buyer and $3525 debit to the seller c. $777 credit to the buyer and $777 debit to the seller d. $3525 debit to the buyer and $3525 credit to the seller *Can anyone help with this? I am studying for my real estate exam and am having trouble with some of the calculations :)
Perform operations with the polynomials P(x) = x3 and Q(x) = 2x2 + x – 3x3 : a) P(x) - Q(x)
solve R the following equation 4 x squared - 35 - 9 over x squared is equal to 0
Square root of 169 with steps
To paint a 250 m wall, a number of workers were employed. If the wall were 30 m longer, 9 more workers would be needed. How many were employed at the beginning?
Consider a sample space S, and two events A and B such that P(A ∩ B) = 0.2, P(A ∪ B) = 0.6, P(B ∪ ̄A) = 0.8 (a) [0.5 points] Calculate P (A). (b) [0.5 points] Calculation P (B)
6(k-7) -2=5
To apply a diagnostic test, in how many ways can 14 students be chosen out of 25? if the order does not matter