Question

In the Monge projection, construct a regular tetrahedral prism with substructure ABCD in the plane q (55.70.45) given the centre S (0.30,?) of the substructure ABCD and the vertex E (25.75.85) of the other substructure

113

likes
567 views

Answer to a math question In the Monge projection, construct a regular tetrahedral prism with substructure ABCD in the plane q (55.70.45) given the centre S (0.30,?) of the substructure ABCD and the vertex E (25.75.85) of the other substructure

Expert avatar
Madelyn
4.7
88 Answers
Abychom sestrojili pravidelný čtyřboký hranol s podstrukturou ABCD v Mongeově projekci, musíme provést tyto kroky: Začněte kreslením roviny q (55.70.45) v Mongeově promítání. Tato rovina bude obsahovat substrukturu ABCD. Najděte střed S (0,30,?) spodní konstrukce ABCD na rovině. Přesná poloha S bude záviset na chybějící souřadnici. Nakreslete substrukturu ABCD kolem středu S. Protože ABCD je pravidelný čtyřstěn, všechny strany jsou stejně dlouhé a všechny úhly jsou stejné. Najděte vrchol E (25.75.85) druhé podstruktury. Tento vrchol není v rovině q, takže bude nad nebo pod rovinou v závislosti na jeho souřadnicích. Nakreslete druhou podstrukturu kolem vrcholu E. Tato podstruktura je také pravidelný čtyřstěn. Spojte odpovídající vrcholy dvou substruktur a vytvořte hranol.

Frequently asked questions (FAQs)
What is the period of the trigonometric function y = 3sin(2x) in terms of radians?
+
Math question: What is the slope-intercept equation of the line passing through the points (3, 7) and (-2, -5)?
+
Math Question: Using the distributive property, factorize the equation 3x + 6 - 2x - 8.
+
New questions in Mathematics
Y=-x^2-8x-15 X=-7
58+861-87
We have spent 1/4 of the inheritance on taxes and 3/5 of the rest on buying a house. If the inheritance was a total of €150,000 How much money do we have left?
find all matrices that commute with the matrix A=[0 1]
What is the total tolerance for a dimension from 1.996" to 2.026*?
20% of 3500
find f(x) for f'(x)=3x+7
3. A rock is dropped from a height of 16 ft. It is determined that its height (in feet) above ground t seconds later (for 0≤t≤3) is given by s(t)=-2t2 + 16. Find the average velocity of the rock over [0.2,0.21] time interval.
The market for economics textbooks is represented by the following supply and demand equations: P = 5 + 2Qs P = 20 - Qd Where P is the price in £s and Qs and Qd are the quantities supplied and demanded in thousands. What is the equilibrium price?
A researcher is interested in voting preferences on change of the governing constitution in a certain country controlled by two main parties A and B. A questionnaire was developed and sent to a random sample of voters. The cross tabs are as follows Favour Neutral Oppose Membership: Party A 70 90 85 Party B 50 50 155 Test at α = 0.05 whether party membership and voting preference are associated and state the conditions required for chi-square test results to be valid.
3/9*4/8=
TEST 123123+123123
User One of the applications of the derivative of a function is its use in Physics, where a function that at every instant t associates the number s(t), this function s is called the clockwise function of the movement. By deriving the time function we obtain the velocity function at time t, denoted by v(t). A body has a time function that determines its position in meters at time t as S(t)=t.³√t+2.t . Present the speed of this body at time t = 8 s.
find missing measure for triangle area = 48 m square base = 10m heaighy = ? m
94 divided by 8.75
2x-5-x+2=5x-11
Given two lines 𝐿1: 𝑥 + 4𝑦 = −10 and 𝐿2: 2𝑥 − 𝑦 = 7. i. Find the intersection point of 𝐿1 and 𝐿2.
a) 6x − 5 > x + 20
the product of a 2-digit number and a 3-digit number is about 50000, what are these numbers
A plant found at the bottom of a lake doubles in size every 10 days. Yeah It is known that in 300 days it has covered the entire lake, indicate how many days it will take to cover the entire lake four similar plants.