It takes 14 days to make a work 15 meters long, 8 meters wide and 4.75 meters high, at a rate of 6 hours of work each day. If 8 days are spent making another work of the same width and twice the length, working 7 hours a day with the difficulty of this work being 3/4 of the previous one, what is the height of the work?
68
likes