Question

The cost of unleaded gasoline in the Bay Area once followed an unknown distribution with a mean of $4.59 and a standard deviation of $0.10. Sixteen gas stations from the Bay Area are randomly chosen. We are interested in the average cost of gasoline for the 16 gas stations. 84. Find the probability that the average price for 30 gas stations is less than $4.55. a 0.6554 b 0.3446 c 0.0142 d 0.9858 e 0

195

likes
973 views

Answer to a math question The cost of unleaded gasoline in the Bay Area once followed an unknown distribution with a mean of $4.59 and a standard deviation of $0.10. Sixteen gas stations from the Bay Area are randomly chosen. We are interested in the average cost of gasoline for the 16 gas stations. 84. Find the probability that the average price for 30 gas stations is less than $4.55. a 0.6554 b 0.3446 c 0.0142 d 0.9858 e 0

Expert avatar
Gene
4.5
98 Answers
Letter C

Frequently asked questions (FAQs)
Q: What is the period, range, and x-intercepts of the function f(x) = cot x?
+
What is the derivative of f(x) = (sin(e^x))^2 using the chain rule?
+
Find the basis of vectors for a given set {(1, 2, 3), (4, 5, 6), (7, 8, 9)} in R^3.
+
New questions in Mathematics
The time it takes for a person to travel 300 m is 15 minutes. What is their speed in meters per second?
The gross domestic product the gdp for the United States in 2017 was approximately $2.05x10^3. If you wrote this number in standard notation , it would be 205 followed by how many zeros
The actual length of an object is 1.3 m . If the blueprint uses a scale of 1 : 12 , what is the length of the line on the drawing?
(-5/6)-(-5/4)
Solve this mathematical problem if 3/5 of a roll of tape measures 2m. How long is the complete roll?
2x2 and how much?
A construction company is working on two projects: house construction and building construction. Each house requires 4 weeks of work and produces a profit of $50,000. Each building requires 8 weeks of work and produces a profit of $100,000. The company has a total of 24 work weeks available. Furthermore, it is known that at least 2 houses and at least 1 building must be built to meet the demand. The company wants to maximize its profits and needs to determine how many houses and buildings it should build to meet demand and maximize profits, given time and demand constraints.
In a order to compare the means of two populations, independent random samples of 410 observations are selected from each population, with Sample 1 the results found in the table to the right. Complete parts a through e below. X1 = 5,319 S1= 143 a. Use a 95% confidence interval to estimate the difference between the population means (H - H2) Interpret the contidence interval. The contidence interval IS (Round to one decimal place as needed.) Sample 2 X2 = 5,285 S2 = 198 Aa. Use a 95% confidence interval to estimate the difference between the population means (A1 - M2) Interpret the contidence interval. The contidence interval Is (Round to one decimal place as needed.) b. Test the null hypothesis Ho versus alternative hypothesis Ha (H What is the test statistic? H2) + Give the significance level of the test, and interpret the result. Use a = 0.05. Z=
28 is 92 percent of what?
In measuring the internal radius of a circular sewer the measurement is 2% too large. If this measurement is then used to calculate the circular cross-sectional area of the pipe: Determine, by using the binomial theory, the percentage error that will occur compared to the true area.
A building lot is in the shape of a triangle with a base of 133 feet and a height of 76 feet. What is it's area in square feet?
The mass of 120 molecules of X2C4 is 9127.2 amu. Identify the unknown atom, X, by finding the atomic mass. The atomic mass of C is 12.01 amu/atom
The annual real property tax liability for a residential property is $4302 and has been paid by the seller in advance of closing. Using the 30-day month/260-day year method what will be the tax proration entry on the settlement statement round to the nearest dollar for a closing on Oct. 26 if the buyer owns the day of closing? a. $3525 credit to the buyer and $777 debit to the seller b. $777 debit to the buyer and $3525 debit to the seller c. $777 credit to the buyer and $777 debit to the seller d. $3525 debit to the buyer and $3525 credit to the seller *Can anyone help with this? I am studying for my real estate exam and am having trouble with some of the calculations :)
Perform operations with the polynomials P(x) = x3 and Q(x) = 2x2 + x – 3x3 : a) P(x) - Q(x)
solve R the following equation 4 x squared - 35 - 9 over x squared is equal to 0
Square root of 169 with steps
To paint a 250 m wall, a number of workers were employed. If the wall were 30 m longer, 9 more workers would be needed. How many were employed at the beginning?
Consider a sample space S, and two events A and B such that P(A ∩ B) = 0.2, P(A ∪ B) = 0.6, P(B ∪ ̄A) = 0.8 (a) [0.5 points] Calculate P (A). (b) [0.5 points] Calculation P (B)
6(k-7) -2=5
To apply a diagnostic test, in how many ways can 14 students be chosen out of 25? if the order does not matter