Total work hours are 5*72 =360 hours. To complete the total work on 60 hours 360/60 = 6 people are required.
Frequently asked questions (FAQs)
Question: In triangle ABC, the measure of angle A is 60 degrees. The angle bisector of angle A intersects side BC at point D. If the measure of angle DAC is 30 degrees, what is the measure of angle B?
+
Math question: How many kilometers are equivalent to 5 miles?
+
What is the value of 5 raised to the power of (-3) multiplied by the square root of 25?